Modernization of CHP Plant and Installation of Solar Thermal System

Remotorization of the Moislinger Berg CHP Plant including the installation of a Power-to-Heat system, as well as construction of a solar thermal system including a thermal storage and energy center.

Our services:

  • HOAI service phases 1 to 9
  • Replacement of a 2 MWel CHP unit
  • Installation of a Power-to-Heat system
  • Construction of a solar thermal system on an area of approximately 25,000 m² with a yield of 3.7 GWh/a, including thermal storage and energy center
  • Lot-based tendering and contract award