Modernization of CHP Plant and Installation of Solar Thermal System
Details
Auftraggeber
Lübeck Municipal Utilities
Land
Germany
Standort
Lübeck
Zeitraum
2023 – 2025
Modernization of CHP Plant and Installation of Solar Thermal System
Remotorization of the Moislinger Berg CHP Plant including the installation of a Power-to-Heat system, as well as construction of a solar thermal system including a thermal storage and energy center.
Our services:
HOAI service phases 1 to 9
Replacement of a 2 MWel CHP unit
Installation of a Power-to-Heat system
Construction of a solar thermal system on an area of approximately 25,000 m² with a yield of 3.7 GWh/a, including thermal storage and energy center